Key takeaways
- Start with the opening and what it has to do, not with a catalog.
- Material, glass, hardware and installation all affect how a door performs.
- A damaged frame or sill should be repaired before a new door goes in.
- A written scope keeps the work in order and easy to compare.
Start with the opening
Look at where the door sits and what it faces. A front door under a deep porch has an easier life than one in full afternoon sun. A back door that opens to a deck sees water and foot traffic. A garage door sees constant motion. The conditions decide which material and which hardware make sense.
Note the problems you have today: drafts, sticking, rot at the bottom, noise, poor security or simply an outdated look. A short list keeps the project focused.
Measure and look closely
Measure the width and height of the opening in three places, and note which way the door swings. Check the floor under the door for softness and look at the bottom of the frame for stains or rot. If water has been getting in, the repair has to come before the new door.
Take a few photos of the opening from inside and outside. They make it easy to explain the project and to compare proposals.
Decide the big choices
The main decisions are material, style, glass, color and hardware. Material affects upkeep and durability, glass affects light and privacy and hardware affects security and daily use. Decide what matters most to you and let the rest follow.
If the door is part of a larger remodel, settle the door sizes before the walls are finished, since changing an opening later is more work.
Put it in writing
A clear scope lists the doors, the frame work, the materials, the hardware and what happens to the old door. It makes proposals easy to compare and prevents surprises.
Ask who handles trim, paint or stain, and how the opening will be protected while the old door is out.
Quick answers
Where should I begin?
With the opening: size, swing, condition of the frame and what the door faces.
Should I fix the frame first?
Yes. A new door in a rotted frame will not seal or last.
How long does a door project take?
Many single doors take a day. Larger openings and multi-door projects take longer.